2 artistic
works were realized for the new building of the Munich Re group (architects:
Baumschlager & Eberle). The first consisted of two large moss
walls installed above the main entrances. The second is a light installation
with vertical light fibres attached to the outer windows of the main
facade. 38 projectors dim the light in the fibres rhythmically up
and down in a chronological order and give the impression of a moving
light wave running from the left to the right of the building.